As an example, consider the following for a coal-fired power plant of capacity 500 MW, about 2 million tons of coal are needed each year to produce the continuous power. Also, coal combustion in the boiler requires roughly 1.6 million cubic meters m 3 of air in an hour to be delivered by fans into the furnace.